A fuzzy neural network to estimate at completion costs of construction projects


Mohammad Reza Feylizadeh, Ayad Hendalianpour and Morteza Bagherpour


In construction cost management system, normally earned value management (EVM) is applied as an efficient control approach in both status detection and estimation at completion (EAC) cost forecasting. The traditional approaches in EAC predictions normally extend the current situation of a project to the future by employing pervious performance factor. The proposed approach of this paper considers both qualitative and quantitative factors affecting the EAC prediction. The proposed approach of this research not only estimates the completion of the project, but also it can generate accurate forecast for the entire future periods using a fuzzy neural network model. The model is also implemented for a real-world case study and yields encouraging preliminary results.


DOI: 10.5267/j.ijiec.2011.11.003

Keywords: EAC, Earned value management, Fuzzy neural network, Construction cost management

References

References Alvarado, C. M., Silverman, R. P., & Wilson, D. S. (2004). Assessing the performance of construction projects: Implementing earned value management at the General Services Administration. Journal of Facilities Management, 3(1), 92-105.

Bagherpour M., Zareei A., Noori S., & Heydari M. (2010). Designing a control mechanism using earned value analysis: an application to production environment. International Journal of Advanced Manufacturing Technology, 40, 419-429.

Chou J.-S., Chen H.-M., Hou C.-C., & Lin C.-W. (2010). Visualized EVM system for assessing project performance. Automation in Construction, 19, 596–607.

Cioffi, D. F. (2006). Designing project management: A scientific notation and an improved formalism for earned value calculations. International Journal of Project Management, 24, 136–144.

Fleming, Q. W., & Koppelman, J. M. (2005). Earned Value Project Management (3rd Edition): Project Management Institute, Newtown Square, PA.

Fleming, Q. W., & Koppelman, J. M. (2010). Earned Value Project Management (Fourth Edition): Project Management Institute.

Grigoroudis, E., & Siskos, Y. (2002). Preference disaggregation for measuring and analyzing customer satisfaction: The MUSA method. European Journal of Operational Research, 143(1), 148-170.

Howes, R. (2000). Improving the performance of Earned Value Analysis as a construction project management tool. Engineering, Construction and Architectural Management, 7(4), 399 - 411.

Ishibuchi, H., Fujioka, R., & Tanaka, H. (1992). An architecture of neural network for input vectors of fuzzy numbers. IEEE International Conference on Fuzzy System, San Diego, CA, USA, 1293- 1300.

Ishibuchi, H., Kwon, K., & Tanaka, H.( 1995). A learning algorithm of fuzzy neural networks with triangular fuzzy weights. Fuzzy Sets and Systems, 71(3) 277–293.

Jigeesh, N., & Bhat, M. S. (2006). Modeling and simulating the dynamics in project monitoring and earned value analysis. Journal of Advances in Management Research, 3(1), 26-43.

Kim, E., Wells Jr., W. G., & Duffey, M. R. (2003). A model for effective implementation of Earned Value Management methodology. International Journal of Project Management, 21, 375–382.

Lipke, W., Zwikael, O., & Henderson, K., Anbari, F. (2009). Prediction of project outcome: The application of statistical methods to earned value management and earned schedule performance indexes. International Journal of Project Management, 27, 400–407.

Moslemi Naeni L., Shadrokh S., & Salehipour A. (2011). A fuzzy approach for the earned value management. International Journal of Project Management, 29 (6), 764-772.

Moslemi Naeni L., & Salehipour A. (2011). Evaluating fuzzy earned value indices and estimates by applying alpha cuts. Expert Systems with Applications, 38, 8193–8198.

Noori, S., Bagherpour M., & Zareei, A. (2008). Applying Fuzzy Control Chart in Earned Value Analysis: A New Application. World Applied Sciences Journal, 3(4), 684-690.

Noori S., Bagherpour, M., & Zorriasatine, F. (2008). Designing a Control Mechanism for Production Planning Problems By Means of Earned Value Analysis. Journal of Applied Sciences, 8(18), 3221-3227.

Pajares J., & López-Paredes A. (2011). An extension of the EVM analysis for project monitoring: The Cost Control Index and the Schedule Control Index. International Journal of Project Management, 29(5), 615-621.

Vandevoorde, S., & Vanhoucke, M. (2006). A comparison of different project duration forecasting methods using earned value metrics. International Journal of Project Management, 24, 289–302.

Warburton, R. D. H. (2011). A time-dependent earned value model for software projects. International Journal of Project Management. Article in Press.