• Home
  • About Us
  • Author Index
  • Title Index


A K
Adalati, M. S. 2010; 1 (1): 79-93 Kenne, J-P. 2010; 1 (2): 95-120
Akhavan, P. 2010; 1 (1): 79-93 Khan, D. 2010; 1 (2): 139-146
Arabi, F. 2010; 1 (2): 173-184
Ard, D. 2010; 1 (2): 185-198 M
Mahdavi Mazdeh, M. 2010; 1 (2): 147-156
B Makui, A. 2010; 1 (2): 199-212
Black, G 2010; 1 (2): 185-198 Moattar Husseini, S. M. 2010; 1 (1): 45-54
Bouquard, J. L. 2010; 1 (1): 33-44 Modarres, M. 2010; 1 (2): 173-184
Mokhlesian, M. 2010; 1 (2): 121-138
C
Chen, Y-M 2010; 1 (2): 157-172 N
Naeij, J. 2010; 1 (1): 11-32
D Najmi, A. 2010; 1 (2): 199-212
Dao, T-M. 2010; 1 (2): 95-120 Nikoofal, M. E. 2010; 1 (1): 45-54
Diep, T. 2010; 1 (2): 95-120
R
F Ramezanian, R. 2010; 1 (1): 1-10
Farhang Moghadam, B. 2010; 1 (1): 55-64 Roghanian, E. 2010; 1 (1): 65-72
Fatemi Ghomi, S. M. T. 2010; 1 (2): 121-138 Roy, D. 2010; 1 (2): 139-146
Firouzi Jahantigh, F. 2010; 1 (2): 147-156
Foroughi, A. 2010; 1 (1): 65-72 S
Sadi-Nezhad, S. 2010; 1 (2): 173-184
G Schibik, T. 2010; 1 (2): 185-198
Ghaffari-Nasab, N. 2010; 1 (1): 1-10 Seyedhosseini, S. M. 2010; 1 (1): 55-64
Gharakhani, M. 2010; 1 (1): 73-78 Sharifi-Yazdi, S. 2010; 1 (1): 79-93
Shavandi, H. 2010; 1 (1): 11-32
H Smith, J. 2010; 1 (2): 185-198
Hosnavi, R. 2010; 1 (1): 79-93 Sayadi, M. K. 2010; 1 (1): 1-10
J T
Jalali Farahani, K. 2010; 1 (1): 73-78 Taghipour, T. 2010; 1 (1): 73-78
Jolai, F. 2010; 1 (2): 121-138
W
Wang, W-S. 2010; 1 (2): 157-172
Z
Zaerpour, F. 2010; 1 (2): 147-156
Ziaee, M. 2010; 1 (1): 33-44

Go Top

A J
AHP 2010; 1 (2): 173-184 Job deterioration 2010; 1 (2): 147-156
Airport Transportation 2010; 1 (1): 65-72
Analytical Hierarchy Process 2010; 1 (2): 199-212 K
ANOVA normality assumption 2010; 1 (2): 185-198 KKT conditions 2010; 1 (1): 11-32
ANOVA robustness 2010; 1 (2): 185-198 Knowledge management 2010; 1 (1): 73-78
Ant colony 2010; 1 (1): 1-10 Multi-objective optimization 2010; 1 (2): 157-172
Assembly Line 2010; 1 (2): 139-146 N
Nonlinear programming 2010; 1 (1): 11-32
B Normality violation 2010; 1 (2): 185-198
Balancing Loss 2010; 1 (2): 139-146 Numerical method 2010; 1 (2): 95-120
Bi-objective 2010; 1 (2): 147-156 O
One-buyer One-supplier VMI 2010; 1 (1): 33-44
C Optimal pricing 2010; 1 (1): 11-32
Combinatorial optimization 2010; 1 (1): 1-10 Optimal Pricing 2010; 1 (1): 33-44
Consistency ratio 2010; 1 (2): 173-184 Optimality conditions 2010; 1 (2): 95-120
P
D Particle swarm optimization 2010; 1 (2): 157-172
DEA 2010; 1 (1): 65-72 Permutation flow shop 2010; 1 (1): 1-10
DEMATEL 2010; 1 (2): 199-212 Portal challenges 2010; 1 (1): 73-78
Dependent returns 2010; 1 (1): 45-54 Preference ratio 2010; 1 (2): 173-184
Discount cash flow 2010; 1 (2): 121-138 Production Planning 2010; 1 (1): 73-78
Disposal rate 2010; 1 (1): 45-54 PSO 2010; 1 (1): 55-64
PSO 2010; 1 (2): 157-172
E R
Echelon supply chain 2010; 1 (1): 11-32 Redundancy 2010; 1 (1): 73-78
Economic dispatch 2010; 1 (2): 157-172 Reusable items 2010; 1 (1): 45-54
Economic lot scheduling problem 2010; 1 (2): 121-138 Reverse logistics 2010; 1 (1): 45-54
Economic Order Quantity 2010; 1 (1): 33-44 Robust Optimization 2010; 1 (1): 55-64
Economic Scale 2010; 1 (1): 65-72 Robust Optimization 2010; 1 (1): 65-72
Efficiency 2010; 1 (1): 65-72 Robust Optimization 2010; 1 (1): 73-78
Emission controlled 2010; 1 (2): 157-172 S
Scale parameter 2010; 1 (2): 185-198
F Scheduling 2010; 1 (1): 1-10
Factor analysis 2010; 1 (1): 73-78 Scheduling 2010; 1 (2): 147-156
FAHP 2010; 1 (2): 173-184 Semi-Markov process 2010; 1 (2): 95-120
Firefly meta-heuristic 2010; 1 (1): 1-10 Sequencing 2010; 1 (2): 147-156
Flow-shop system 2010; 1 (2): 95-120 Shape parameter 2010; 1 (2): 185-198
Fuzzy decision making 2010; 1 (2): 147-156 Single machine 2010; 1 (2): 147-156
Fuzzy numbers 2010; 1 (2): 173-184 Supply chain 2010; 1 (2): 139-146
Supply chain management 2010; 1 (1): 11-32
G Supply Chain Management 2010; 1 (1): 33-44
Genetic algorithm 2010; 1 (2): 121-138 Supply Chain Performance 2010; 1 (2): 199-212
Geometric Programming 2010; 1 (1): 33-44 T
Taguchi method 2010; 1 (1): 55-64
H Two-buyer Two-supplier VMI 2010; 1 (1): 33-44
Heuristic method 2010; 1 (2): 95-120 Unit commitment 2010; 1 (2): 157-172
Hybrid method 2010; 1 (2): 121-138 V
Vendor managed inventory 2010; 1 (1): 11-32
I Vendor Managed Inventory 2010; 1 (1): 33-44
Information technology 2010; 1 (1): 73-78 VRP 2010; 1 (1): 55-64
Integration 2010; 1 (2): 199-212 W
Inventory management 2010; 1 (1): 45-54 Weibull 2010; 1 (2): 185-198
Work in process 2010; 1 (2): 147-156
Go Top

� 2010 GrowingScience.Com