A case study to estimate costs using neural networks and regression based models


Adil Salam, Fantahun M. Defersha and Nadia Bhuiyan


Bombardier Aerospace’s high performance aircrafts and services set the utmost standard for the Aerospace industry. A case study in collaboration with Bombardier Aerospace is conducted in order to estimate the target cost of a landing gear. More precisely, the study uses both parametric model and neural network models to estimate the cost of main landing gears, a major aircraft commodity. A comparative analysis between the parametric based model and those upon neural networks model will be considered in order to determine the most accurate method to predict the cost of a main landing gear. Several trials are presented for the design and use of the neural network model. The analysis for the case under study shows the flexibility in the design of the neural network model. Furthermore, the performance of the neural network model is deemed superior to the parametric models for this case study.


DOI: j.dsl.2012.07.002

Keywords: Target cost ,Parametric models ,Neural networks

How to cite this paper:

Salam, A., Defersha, F & Bhuiyan, N. (2012). A case study to estimate costs using neural networks and regression based models.Decision Science Letters, 1(1), 1-10.


References

Assaf, S. A. & Al-Hejji, S. (2006).Causes of delay in large construction projects. International Journal of Project Management, 24 (4), 349-356.

Colmer, G., Dunkley, M., Gray, K., Pugh, P., & Williamson, A. (1999). Estimating the cost of new technology products. International Journal of Technology Management, 17(7-8), 840-846.

Bashir, H. A., & Thomson, V. (2004). Estimating design effort for GE hydro projects. Computer & Industrial Engineering, 46(2), 195-204.

Boehm, B. W. (1981). Software Engineering Economy. New Jersey: Prentice-Hall Inc.

Bounds, G. (1998). The last word on project management. IIE Solutions, 30(11), 41-43.

Frimpong, Y. (2000). Project management in developing countries: causes of delay and cost overruns in construction of groundwater projects. Masters Research Project: University of Technology, Sydney, Australia.

Huang, S. C., & Huang, Y.-F. (1991). Bounds on the numbers of neurons in multilayer perceptrons. IEEE Transaction on Neural Networks, 2: 47 – 55.

Kecman, V.(2001). Learning and Soft Computing. Cambridge: MIT Press.

Kutner, M.H., Nachtsheim, C. J., Neter, J., & Li, W.(2004). Applied Linear Statistical Models(5th Edition), New York: McGraw-Hill/Irwin.

Muralidhar, K., Parsa, R., & Sarathy, R.(1999).A general additive data perturbation method for database security. Management Science, 45(10), 1399-1415.

Murmann, P. A. (1994). Expected development time reductions in the German mechanical engineering industry. Journal of Product Innovation Management, 11 (3), 236-252.

Norris, K.P. (1971). The Accuracy of project cost and duration estimates in industrial R&D. R&D Management, 2 (1), 25-36.

Pandya, A. S. & Macy, R. B. (1996). Pattern Recognition with Neural Networks in C++.Florida: CRC Press.

Salam, A., Bhuiyan, N., Gouw, G.J., & Raza, S. A. (2009).Estimating design effort for the compressor design department: A case study at Pratt & Whitney Canada. Design Studies, 30(3), 303-319.

Salam, A.M., Bhuiyan, N.F., Gouw, G.J., & Raza, S. A. (2008). A case study to estimate design effort for Pratt & Whitney Canada. International Journal of Management Science and Engineering Management, 3 (4), 284-293.

Salam, A., Bhuiyan, N., Gouw, G., & Raza, A. (2008). Measuring Design Effort in Product Development. Germany: VDM Verlag.

Snyman, J. A. (2005). Practical mathematical optimization: an introduction to basic optimization theory and classical and new gradient-based algorithms. New York: Springer.

Walston, C. E., & Felix, C. P. (1977). A method of programming measurement and estimation. IBM System Journal, 16(1), 54-73.