Editor


Masoud Rabbani, Department of Industrial Engineering,
College of Engineering,
University of Tehran, Tehran, Iran
Email: mrabani@ut.ac.ir
Tel: +98 21 88335605
Fax: +98 21 88013102

Publications

Rabbani, M., Foroozesh, N., Mousavi, S.M., Farrokhi-Asl, H. Sustainable supplier selection by a new decision model based on interval-valued fuzzy sets and possibilistic statistical reference point systems under uncertainty (2019) International Journal of Systems Science: Operations and Logistics, 6 (2), pp. 162-178.

Rabbani, M., Yazdanparast, R., Mobini, M. An algorithm for performance evaluation of resilience engineering culture based on graph theory and matrix approach (2019) International Journal of Systems Assurance Engineering and Management, 10 (2), pp. 228-241.

Rabbani, M., Farrokhi-Asl, H., Ravanbakhsh, M. Dynamic cellular manufacturing system considering machine failure and workload balance (2019) Journal of Industrial Engineering International, 15 (1), pp. 25-40.

Rabbani, M., Heidari, R., Yazdanparast, R. A stochastic multi-period industrial hazardous waste location-routing problem: Integrating NSGA-II and Monte Carlo simulation (2019) European Journal of Operational Research, 272 (3), pp. 945-961.

Rabbani, M., Mousavi, Z. Location of temporary depot after an earthquake based on robust optimization (2019) International Journal of Industrial Engineering and Production Research, 30 (1), .

Rabbani, M., Aliabadi, L. An inventory model with credit, price and marketing dependent demand under permitted delayed payments and shortages: A signomial geometric programming approach (2019) Uncertain Supply Chain Management, 7 (1), pp. 33-48.

Gholami-Zanjani, S.M., Gholipour, S., Rabbani, M. An integrated approach for robust inventory routing problem in a three-echelon distribution system (2019) International Journal of Logistics Systems and Management, 32 (3-4), pp. 414-436.

Alamdar, S.F., Rabbani, M., Heydari, J. Optimal decision problem in a three-level closed-loop supply chain with risk-averse players under demand uncertainty (2019) Uncertain Supply Chain Management, 7 (2), pp. 351-368.

Rabbani, M., Heidari, R., Farrokhi-Asl, H. A bi-objective mixed-model assembly line sequencing problem considering customer satisfaction and customer buying behaviour (2018) Engineering Optimization, 50 (12), pp. 2123-2142.

Bodaghi, G., Jolai, F., Rabbani, M. Evaluating supply chain flexibility under demand uncertainty with smoothing approach and VMI considerations (2018) Journal of Industrial and Production Engineering, 35 (8), pp. 486-505.

Rabbani, M., Saravi, N.A., Farrokhi-Asl, H., Lim, S.F.W.T., Tahaei, Z. Developing a sustainable supply chain optimization model for switchgrass-based bioenergy production: A case study (2018) Journal of Cleaner Production, 200, pp. 827-843.

Rabbani, M., Bosjin, S.A., Yazdanparast, R., Saravi, N.A. A stochastic time-dependent green capacitated vehicle routing and scheduling problem with time window, resiliency and reliability: A case study (2018) Decision Science Letters, 7 (4), pp. 381-394.

Rabbani, M., Manavizadeh, N., Arani, H.V., Alamdar, S.F. An American option contract toward supply chain coordination (2018) Decision Science Letters, 7 (4), pp. 503-522.

Alamdar, S.F., Rabbani, M., Heydari, J. Pricing, collection, and effort decisions with coordination contracts in a fuzzy, three-level closed-loop supply chain (2018) Expert Systems with Applications, 104, pp. 261-276.

Rabbani, M., Pourreza, P., Farrokhi-Asl, H., Nouri, N. A hybrid genetic algorithm for multi-depot vehicle routing problem with considering time window repair and pick-up (2018) Journal of Modelling in Management, 13 (3), pp. 698-717.

Rabbani, M., Mokhtarzadeh, M., Farrokhi-Asl, H. A new mathematical model for designing a municipal solid waste system considering environmentally issues (2018) International Journal of Supply and Operations Management, 5 (3), pp. 234-255.

Rabbani, M., Salmanzadeh-Meydani, N., Farshbaf-Geranmayeh, A., Fadakar-Gabalou, V. Profit maximizing through 3D shelf space allocation of 2D display orientation items with variable heights of the shelves (2018) OPSEARCH, 55 (2), pp. 337-360.

Bodaghi, G., Jolai, F., Rabbani, M. An integrated weighted fuzzy multi-objective model for supplier selection and order scheduling in a supply chain (2018) International Journal of Production Research, 56 (10), pp. 3590-3614.

Rafiei, H., Safaei, F., Rabbani, M. Integrated production-distribution planning problem in a competition-based four-echelon supply chain (2018) Computers and Industrial Engineering, 119, pp. 85-99.

Rabbani, M., Tahaei, Z., Farrokhi-Asl, H., Saravi, N.A. Using meta-heuristic algorithms and hybrid of them to solve multi compartment Vehicle Routing Problem (2018) IEEE International Conference on Industrial Engineering and Engineering Management, 2017-December, pp. 1022-1026.

Farshbaf-Geranmayeh, A., Rabbani, M., Taleizadeh, A.A. Channel Coordination with Cooperative Advertising Considering Effect of Advertising on Willingness to Pay (2018) Journal of Optimization Theory and Applications, 176 (2), pp. 509-525.

Rabbani, M., Zahedifard, S., Rezaei-Malek, M. An integrated multi-criteria decision-making approach for portfolio problem in energy service companies under uncertainty (2018) Economic Computation and Economic Cybernetics Studies and Research, 52 (4), pp. 305-322.

Rabbani, M., Farshbaf-Geranmayeh, A., Yazdanparast, R. A simulation optimization approach for integrated resource allocation in an emergency department, pharmacy, and lab (2018) Intelligent Decision Technologies, 12 (2), pp. 187-212.

Rabbani, M., Mohammadi, S., Mobini, M. Optimum design of a CCHP system based on economical, energy and environmental considerations using GA and PSO (2018) International Journal of Industrial Engineering Computations, 9 (1), pp. 99-122.

Rabbani, M., Zhalechian, M., Farshbaf-Geranmayeh, A. A robust possibilistic programming approach to multiperiod hospital evacuation planning problem under uncertainty (2018) International Transactions in Operational Research, 25 (1), pp. 157-189.

Rabbani, M., Hosseini-Mokhallesun, S.A.A., Ordibazar, A.H., Farrokhi-Asl, H. A hybrid robust possibilistic approach for a sustainable supply chain location-allocation network design (2018) International Journal of Systems Science: Operations and Logistics, . Article in Press.

Rabbani, M., Sabbaghnia, A., Mobini, M., Razmi, J. A graph theory-based algorithm for a multi-echelon multi-period responsive supply chain network design with lateral-transshipments (2018) Operational Research, . Article in Press.

Rabbani, M., Aghsami, A., Farahmand, S., Keyhanian, S. Risk and revenue of a lessor's dynamic joint pricing and inventory planning with adjustment costs under differential inflation (2018) International Journal of Procurement Management, 11 (1), pp. 1-35.

Rabbani, M., Navazi, F., Farrokhi-Asl, H., Balali, M.H. A sustainable transportation-location-routing problem with soft time windows for distribution systems (2018) Uncertain Supply Chain Management, 6 (3), pp. 229-254.

Rabbani, M., Heidari, R., Farrokhi-Asl, H., Rahimi, N. Using metaheuristic algorithms to solve a multi-objective industrial hazardous waste location-routing problem considering incompatible waste types (2018) Journal of Cleaner Production, 170, pp. 227-241.

Rabbani, M., Rezaei, H., Lashgari, M., Farrokhi-Asl, H. Vendor managed inventory control system for deteriorating items using metaheuristic algorithms (2018) Decision Science Letters, 7 (1), pp. 25-38.

Rabbani, M., Zia, N.P., Rafiei, H. Joint optimal inventory, dynamic pricing and advertisement policies for non-instantaneous deteriorating items (2017) RAIRO - Operations Research, 51 (4), pp. 1251-1267.

Rabbani, M., Keyhanian, S., Manavizadeh, N., Farrokhi-Asl, H. Integrated dynamic cell formation-production planning: A new mathematical model (2017) Scientia Iranica, 24 (5), pp. 2550-2566.

Rabbani, M., Manavizadeh, N., Shabanpour, N. Sequencing of mixed models on U-shaped assembly lines by considering effective help policies in make-to-order environment (2017) Scientia Iranica, 24 (3), pp. 1493-1504.

Mardan, E., Sadegh Amalnick, M., Rabbani, M., Jolai, F. A robust optimization approach for an inventory problem with emergency ordering and product substitution in an uncertain environment: A case study in pharmaceutical industry (2017) Scientia Iranica, 24 (3), pp. 1533-1546.

Babazadeh, R., Razmi, J., Rabbani, M., Pishvaee, M.S. An integrated data envelopment analysis–mathematical programming approach to strategic biodiesel supply chain network design problem (2017) Journal of Cleaner Production, 147, pp. 694-707.

Rabbani, M., Farrokhi-Asl, H., Asgarian, B. Solving a bi-objective location routing problem by a NSGA-II combined with clustering approach: application in waste collection problem (2017) Journal of Industrial Engineering International, 13 (1), pp. 13-27.

Bozorgi-Amiri, A., Tavakoli, S., Mirzaeipour, H., Rabbani, M. Integrated locating of helicopter stations and helipads for wounded transfer under demand location uncertainty (2017) American Journal of Emergency Medicine, 35 (3), pp. 410-417.

Rafiei, H., Rabbani, M., Vafa-Arani, H., Bodaghi, G. Production-inventory analysis of single-station parallel machine make-to-stock/make-to-order system with random demands and lead times (2017) International Journal of Management Science and Engineering Management, 12 (1), pp. 33-44.

Rabbani, M., Farrokhi-Asl, H., Manavizadeh, N. Using robust-DEA optimization approach to analyze performance and efficiency of a mine in north of Iran (2017) Management Science Letters, 7 (2), pp. 97-110.

Rabbani, M., Akbari, E., Dolatkhah, M. Manpower allocation in a cellular manufacturing system considering the impact of learning, training and combination of learning and training in operator skills (2017) Management Science Letters, 7 (1), pp. 9-22.

Farshbaf-Geranmayeh, A., Rabbani, M., Taleizadeh, A.A. Cooperative advertising to induce strategic customers for purchase at the full price (2017) International Transactions in Operational Research, . Article in Press.

Iranmanesh, S.H., Tanhaie, F., Rabbani, M. Improving artificial fish swarm algorithm by applying group escape behavior of fish (2017) Advances in Intelligent Systems and Computing, 576, pp. 46-54.

Rabbani, M., Salehi, R., Farshbaf-Geranmayeh, A. Integrating assortment selection, pricing and mixed-bundling problems for multiple retail categories under cross-selling (2017) Uncertain Supply Chain Management, 5 (4), pp. 315-326.

Rabbani, M., Elahi, S., Javadi, B. A comprehensive quadratic assignment problem for an integrated layout design of final assembly line and manufacturing feeder cells (2017) Decision Science Letters, 6 (2), pp. 165-192.

Rabbani, M., Aghabegloo, M., Farrokhi-Asl, H. Solving a bi-objective mathematical programming model for bloodmobiles location routing problem (2017) International Journal of Industrial Engineering Computations, 8 (1), pp. 19-32.

Kazemi, S.M., Rabbani, M., Tavakkoli-Moghaddam, R., Shahreza, F.A. An exact solution for joint optimization of inventory and routing decisions in blood supply chains: A case study (2017) Economic Computation and Economic Cybernetics Studies and Research, 51 (4), pp. 315-333.

Talebi, E., Tavakkoli-Moghaddam, R., Memari, P., Rabbani, M. Multi-objective model approach to multi-period location-allocation of organ transplant centers under uncertainty (2017) Proceedings of International Conference on Computers and Industrial Engineering, CIE, .

Rabbani, M., Farrokhi-Asl, H., Rafiei, H., Khaleghi, R. Using metaheuristic algorithms to solve a dynamic cell formation problem with consideration of intra-cell layout design (2017) Intelligent Decision Technologies, 11 (1), pp. 109-126.

Kazemi, S.M., Rabbani, M., Tavakkoli-Moghaddam, R., Shahreza, F.A. Blood inventory-routing problem under uncertainty (2017) Journal of Intelligent and Fuzzy Systems, 32 (1), pp. 467-481.

Babazadeh, R., Razmi, J., Pishvaee, M.S., Rabbani, M. A sustainable second-generation biodiesel supply chain network design problem under risk (2017) Omega (United Kingdom), 66, pp. 258-277.

Rabbani, M., Montazeri, M., Farrokhi-Asl, H., Rafiei, H. A multi-objective genetic algorithm for a mixed-model assembly U-line balancing type-I problem considering human-related issues, training, and learning (2016) Journal of Industrial Engineering International, 12 (4), pp. 485-497.

Rabbani, M., Mamaghani, M.G., Farshbaf-Geranmayeh, A., Mirzayi, M. A novel mixed integer programming formulation for selecting the best renewable energies to invest: A fuzzy goal programming approach (2016) Renewable and Alternative Energy: Concepts, Methodologies, Tools, and Applications, pp. 857-878.

Rabbani, M., Mousavi, Z., Farrokhi-Asl, H. Multi-objective metaheuristics for solving a type II robotic mixed-model assembly line balancing problem (2016) Journal of Industrial and Production Engineering, 33 (7), pp. 472-484.

Rabbani, M., Pourmohammad Zia, N., Rafiei, H. Joint optimal dynamic pricing and replenishment policies for items with simultaneous quality and physical quantity deterioration (2016) Applied Mathematics and Computation, 287-288, pp. 149-160.

Vafa Arani, H., Rabbani, M., Rafiei, H. A revenue-sharing option contract toward coordination of supply chains (2016) International Journal of Production Economics, 178, pp. 42-56.

Rabbani, M., Soufi, H.R., Torabi, S.A. Developing a two-step fuzzy cost-benefit analysis for strategies to continuity management and disaster recovery (2016) Safety Science, 85, pp. 9-22.

Rabbani, M., Monshi, M., Manavizadeh, N., Jalali, M.S. Designing an advanced available-to-promise mechanism compatible with the make-to-forecast production systems through integrating inventory allocation and job shop scheduling with due dates and weighted earliness/tardiness cost (2016) International Journal of Industrial Engineering Computations, 7 (3), pp. 451-462.

Rabbani, M., Farrokhi-Asl, H., Rafiei, H. A hybrid genetic algorithm for waste collection problem by heterogeneous fleet of vehicles with multiple separated compartments (2016) Journal of Intelligent and Fuzzy Systems, 30 (3), pp. 1817-1830.

Rabbani, M., Yusefnejad, H. A novel DEANP method for customer order decoupling point positioning in a supply chain (2016) International Journal of Industrial and Systems Engineering, 22 (4), pp. 393-408.

Rabbani, M., Farshbaf-Geranmayeh, A., Haghjoo, N. Vehicle routing problem with considering multi-middle depots for perishable food delivery (2016) Uncertain Supply Chain Management, 4 (3), pp. 171-182.

Rabbani, M., Niyazi, M., Rafiei, H. Production, technology and capacity planning for textile industry: A case study (2016) Uncertain Supply Chain Management, 4 (4), pp. 277-286.

Rabbani, M., Farrokhi-Asl, H., Ameli, M. Solving a fuzzy multi-objective products and time planning using hybrid meta-heuristic algorithm: Gas refinery case study (2016) Uncertain Supply Chain Management, 4 (2), pp. 93-106.

Rabbani, M., Sadri, S., Rafiei, H. A multimodal transportation system routing implemented in waste collection (2016) Decision Science Letters, 5 (1), pp. 61-80.

Rafiei, H., Rabbani, M., Gholizadeh, H., Dashti, H. A novel hybrid SA/GA algorithm for solving an integrated cell formation–job scheduling problem with sequence-dependent set-up times (2016) International Journal of Management Science and Engineering Management, 11 (3), pp. 134-142.

Rabbani, M., Habibnejad-Ledari, H., Rafiei, H., Farshbaf-Geranmayeh, A. A bi-objective mathematical model for dynamic cell formation problem considering learning effect, human issues, and worker assignment (2016) Scientia Iranica, 23 (5), pp. 2341-2354.

Rabbani, M., Ramezankhani, F., Giahi, R., Farshbaf-Geranmayeh, A. Biofuel supply chain considering depreciation cost of installed plants (2016) Journal of Industrial Engineering International, 12 (2), pp. 221-235.

Rabbani, M., Siadatian, R., Farrokhi-Asl, H., Manavizadeh, N. Multi-objective optimization algorithms for mixed model assembly line balancing problem with parallel workstations (2016) Cogent Engineering, 3 (1), art. no. 1158903, .

Rabbani, M., Keyhanian, S., Hasannia, M., Eskandari, M., Jalali, M.S. Impact of end of lease contracts’ option on joint pricing and inventory decisions of remanufacturable leased products (2016) International Journal of Industrial Engineering Computations, 7 (2), pp. 191-204.

Manavizadeh, N., Rabbani, M., Radmehr, F. A new multi-objective approach in order to balancing and sequencing U-shaped mixed model assembly line problem: a proposed heuristic algorithm (2015) International Journal of Advanced Manufacturing Technology, 79 (1-4), pp. 415-425.

Rabbani, M., Zia, N.P., Rafiei, H. Coordinated replenishment and marketing policies for non-instantaneous stock deterioration problem (2015) Computers and Industrial Engineering, 88, pp. 49-62.

Babazadeh, R., Razmi, J., Pishvaee, M.S., Rabbani, M. A non-radial DEA model for location optimization of Jatropha curcas L. cultivation (2015) Industrial Crops and Products, 69, pp. 197-203.

Rabbani, M., Arani, H.V., Rafiei, H. Option contract application in emergency supply chains (2015) International Journal of Services and Operations Management, 20 (4), pp. 385-397.

Rabbani, M., Ziaei, M.-S., Omidvar, A. A new approach to open vehicle routing problem with time window considering vehicle age and monetary value (2015) International Journal of Services and Operations Management, 20 (2), pp. 165-187.

Rabbani, M., Kazemi, S.M. Solving uncapacitated multiple allocation p-hub center problem by Dijkstra’s algorithm-based genetic algorithm and simulated annealing (2015) International Journal of Industrial Engineering Computations, 6 (3), pp. 405-418.

Rabbani, M., Tanhaie, F. A Markov chain analysis of the effectiveness of drum-buffer-rope material flow management in job shop environment (2015) International Journal of Industrial Engineering Computations, 6 (4), pp. 457-468.

Rabbani, M., Manavizadeh, N., Aghozi, N.S.H. Robust optimization approach to production system with failure in rework and breakdown under uncertainty: Evolutionary methods (2015) Assembly Automation, 35 (1), pp. 81-93.

Rabbani, M., Sadri, S., Manavizadeh, N., Rafiei, H. A novel bi-level hierarchy towards available-to-promise in mixed-model assembly line sequencing problems (2015) Engineering Optimization, 47 (7), pp. 947-962.

Rabbani, M., Ziaeifar, A., Manavizadeh, N. Mixed-model assembly line balancing in assemble-to-order environment with considering express parallel line: Problem definition and solution procedure (2014) International Journal of Computer Integrated Manufacturing, 27 (7), pp. 690-706.

Javadi, B., Jolai, F., Slomp, J., Rabbani, M., Tavakkoli-Moghaddam, R. A hybrid electromagnetism-like algorithm for dynamic inter/intra-cell layout problem (2014) International Journal of Computer Integrated Manufacturing, 27 (6), pp. 501-518.

Rabbani, M., Monshi, M., Rafiei, H. A new AATP model with considering supply chain lead-times and resources and scheduling of the orders in flowshop production systems: A graph-theoretic view (2014) Applied Mathematical Modelling, 38 (24), pp. 6098-6107.

Rabbani, M., Zia, N.P., Rafiei, H. Optimal dynamic pricing and replenishment policies for deteriorating items (2014) International Journal of Industrial Engineering Computations, 5 (4), pp. 621-630.

Rabbani, M., Sadri, Sh., Rafiei, H. Vehicle-routing in a multimodal transportation system used in waste collection (2014) CIE 2014 - 44th International Conference on Computers and Industrial Engineering and IMSS 2014 - 9th International Symposium on Intelligent Manufacturing and Service Systems, Joint International Symposium on "The Social Impacts of Developments in Information, Manufacturing and Service Systems" - Proceedings, pp. 203-212.

Rafiei, H., Rabbani, M. Hybrid MTS/MTO order partitioning framework based upon fuzzy analytic network process (2014) Applied Soft Computing Journal, 19, pp. 312-321.

Rabbani, M., Khalili, S.M., Janani, H., Shiripour, M. Optimization of a dynamic supply portfolio considering risks and discount's constraints (2014) Journal of Industrial Engineering and Management, 7 (1), pp. 218-253.

Rafiei, H., Rabbani, M., Nazaridoust, B., Ramiyani, S.S. Multi-objective cell formation problem considering work-in-process minimization (2014) International Journal of Advanced Manufacturing Technology, 76 (9-12), pp. 1947-1955.

Alimardani, M., Rabbani, M., Rafiei, H. A novel hybrid model based on DEMATEL, ANP and TOPSIS for supplier selection in agile supply chains (2014) International Journal of Services and Operations Management, 18 (2), pp. 179-211.

Keyhanian, S., Rabbani, M. Effect of new inflation-brought competitive purchasing and leasing demand functions on revenue of a joint inventory-pricing decision making model (2014) International Journal of Management and Decision Making, 13 (2), pp. 157-173.

Seif, J., Rabbani, M. Component based life cycle costing in replacement decisions (2014) Journal of Quality in Maintenance Engineering, 20 (4), pp. 436-452.

Rabbani, M., Pourmohammad Zia, N., Rafiei, H. Joint optimization on dynamic pricing, promotion and inventory control of deteriorating items (2014) CIE 2014 - 44th International Conference on Computers and Industrial Engineering and IMSS 2014 - 9th International Symposium on Intelligent Manufacturing and Service Systems, Joint International Symposium on "The Social Impacts of Developments in Information, Manufacturing and Service Systems" - Proceedings, pp. 190-202.

Tavakoli, L., Manavizadeh, N., Rabbani, M. Multi-objective multiple allocation hub location problem with multiple capacity levels considering sustainable development paradigm (2014) International Journal of Applied Decision Sciences, 7 (3), pp. 295-326.

Rafiei, H., Rabbani, M., Hosseini, S.H. Capacity coordination under demand uncertainty in a hybrid make-to-stock/make-to-order environment: A system dynamics approach (2014) Scientia Iranica, 21 (6), pp. 2315-2325.

Rabbani, M., Baghersad, M., Jafari, R. A new hybrid GA-PSO method for solving multi-period inventory routing problem with considering financial decisions (2013) Journal of Industrial Engineering and Management, 6 (4), pp. 909-929.

Javadi, B., Jolai, F., Slomp, J., Rabbani, M., Tavakkoli-Moghaddam, R. An integrated approach for the cell formation and layout design in cellular manufacturing systems (2013) International Journal of Production Research, 51 (20), pp. 6017-6044.

Rabbani, M., Pakzad, F., Kazemi, S.M. A new modelling for p-hub median problem by considering flow-dependent costs (2013) 2013 5th International Conference on Modeling, Simulation and Applied Optimization, ICMSAO 2013, art. no. 6552582, .

Rabbani, M., Zameni, S., Kazemi, S.M. Proposing a new mathematical formulation for modeling costs in a p-hub center problem (2013) 2013 5th International Conference on Modeling, Simulation and Applied Optimization, ICMSAO 2013, art. no. 6552550, .

Babazadeh, R., Rafiei, H., Rabbani, M. A dynamic sustainable cell formation problem in agile production systems (2013) International Journal of Operational Research, 16 (4), pp. 448-464.

Rabbani, M. A novel approach for solving a capacitated location allocation problem (2013) International Journal of Industrial Engineering Computations, 4 (2), pp. 203-214.

Manavizadeh, N., Hasani Goodarzi, A., Rabbani, M., Jolai, F. Order acceptance/rejection policies in determining the sequence in mixed model assembly lines (2013) Applied Mathematical Modelling, 37 (4), pp. 2531-2551.

Manavizadeh, N., Hosseini, N.-S., Rabbani, M., Jolai, F. A Simulated Annealing algorithm for a mixed model assembly U-line balancing type-I problem considering human efficiency and Just-In-Time approach (2013) Computers and Industrial Engineering, 64 (2), pp. 669-685.

Manavizadeh, N., Tavakoli, L., Rabbani, M., Jolai, F. A multi-objective mixed-model assembly line sequencing problem in order to minimize total costs in a Make-To-Order environment, considering order priority (2013) Journal of Manufacturing Systems, 32 (1), pp. X124-137.

Rafiei, H., Rabbani, M., Alimardani, M. Novel bi-level hierarchical production planning in hybrid MTS/MTO production contexts (2013) International Journal of Production Research, 51 (5), pp. 1331-1346.

Keyhanian, S., Shahmohammadi, M.S., Yusuff, R.B.M., Rabbani, M. A fuzzy simulation model for optimizing purchasing time in procurement logistics: Case study of a polymer company (2013) Proceedings of International Conference on Computers and Industrial Engineering, CIE, 2, pp. 1359-1370.

Manavizadeh, N., Rabbani, M., Moshtaghi, D., Jolai, F. Mixed-model assembly line balancing in the make-to-order and stochastic environment using multi-objective evolutionary algorithms (2012) Expert Systems with Applications, 39 (15), pp. 12026-12031.

Rabbani, M., Ghoreyshi, S.M., Rafiei, H., Ghazanfari, M. Energy consumption forecasting using a bi-objective fuzzy linear regression model (2012) International Journal of Services and Operations Management, 13 (1), pp. 1-18.

Rabbani, M., Moghaddam, M., Manavizadeh, N. Balancing of mixed-Model two-Sided assembly lines with multiple u-Shaped layout (2012) International Journal of Advanced Manufacturing Technology, 59 (9-12), pp. 1191-1210.

Moghaddam, M., Rabbani, M., Maleki-Shoja, B. Integrating lateral transshipment to aggregate production-distribution planning considering time value of money and exchange rate (2012) International Journal of Operational Research, 13 (4), pp. 439-464.

Rabbani, M., Kazemi, S.M., Manavizadeh, N. Mixed model U-line balancing type-1 problem: A new approach (2012) Journal of Manufacturing Systems, 31 (2), pp. 131-138.

Rafiei, H., Rabbani, M. Capacity coordination in hybrid make-to-stock/make-to-order production environments (2012) International Journal of Production Research, 50 (3), pp. 773-789.

Rabbani, M., Jolai, F., Manavizadeh, N., Radmehr, F., Javadi, B. Solving a bi-objective cell formation problem with stochastic production quantities by a two-phase fuzzy linear programming approach (2012) International Journal of Advanced Manufacturing Technology, 58 (5-8), pp. 709-722.

Rafiei, H., Radmehr, F., Rabbani, M. A new mathematical model toward project selection-a case study (2012) Applied Mechanics and Materials, 110-116, pp. 2958-2962.

Radmehr, F., Manavizadeh, N., Rafiei, H., Rabbani, M. A new fuzzy approach for minimizing conveyer stoppages in mixed-model assembly lines (2012) Applied Mechanics and Materials, 110-116, pp. 4085-4090.

Rafiei, H., Rabbani, M. Order partitioning and Order Penetration Point location in hybrid Make-To-Stock/Make-To-Order production contexts (2011) Computers and Industrial Engineering, 61 (3), pp. 550-560.

Manavizadeh, N., Dehghani, A., Rabbani, M. Mixed model assembly line sequencing in make to order system with available to promise consideration (2011) World Academy of Science, Engineering and Technology, 81, pp. 707-715.

Manavizadeh, N., Hosseini, M., Rabbani, M. Solving a new mixed-model assembly line sequencing problem in a MTO environment (2011) World Academy of Science, Engineering and Technology, 81, pp. 444-453.

Kazemi, S.M., Ghodsi, R., Rabbani, M., Tavakkoli-Moghaddam, R. A novel two-stage genetic algorithm for a mixed-model U-line balancing problem with duplicated tasks (2011) International Journal of Advanced Manufacturing Technology, 55 (9-12), pp. 1111-1122.

Lotfi, M.M., Rabbani, M., Ghaderi, S.F. A weighted goal programming approach for replenishment planning and space allocation in a supermarket (2011) Journal of the Operational Research Society, 62 (6), pp. 1128-1137.

Rabbani, M., Radmehr, F., Manavizadeh, N. Considering the conveyer stoppages in sequencing mixed-model assembly lines by a new fuzzy programming approach (2011) International Journal of Advanced Manufacturing Technology, 54 (5-8), pp. 775-788.

Rafiee, K., Rabbani, M., Rafiei, H., Rahimi-Vahed, A. A new approach towards integrated cell formation and inventory lot sizing in an unreliable cellular manufacturing system (2011) Applied Mathematical Modelling, 35 (4), pp. 1810-1819.

Ghotboddini, M.M., Rabbani, M., Rahimian, H. A comprehensive dynamic cell formation design: Benders' decomposition approach (2011) Expert Systems with Applications, 38 (3), pp. 2478-2488.

Mobini, M., Mobini, Z., Rabbani, M. An Artificial Immune Algorithm for the project scheduling problem under resource constraints (2011) Applied Soft Computing Journal, 11 (2), pp. 1975-1982.

Pishvaee, M.S., Rabbani, M. A graph theoretic-based heuristic algorithm for responsive supply chain network design with direct and indirect shipment (2011) Advances in Engineering Software, 42 (3), pp. 57-63.

Kalantari, M., Rabbani, M., Ebadian, M. A decision support system for order acceptance/rejection in hybrid MTS/MTO production systems (2011) Applied Mathematical Modelling, 35 (3), pp. 1363-1377.

Pishvaee, M.S., Rabbani, M., Torabi, S.A. A robust optimization approach to closed-loop supply chain network design under uncertainty (2011) Applied Mathematical Modelling, 35 (2), pp. 637-649.

Hemmati, S., Rabbani, M. Make-to-order/make-to-stock partitioning decision using the analytic network process (2010) International Journal of Advanced Manufacturing Technology, 48 (5-8), pp. 801-813.

Ghodratnama, A., Rabbani, M., Tavakkoli-Moghaddam, R., Baboli, A. Solving a single-machine scheduling problem with maintenance, job deterioration and learning effect by simulated annealing (2010) Journal of Manufacturing Systems, 29 (1), pp. 1-9.

Rabbani, M., Aramoon Bajestani, M., Baharian Khoshkhou, G. A multi-objective particle swarm optimization for project selection problem (2010) Expert Systems with Applications, 37 (1), pp. 315-321.

Rabbani, M., Ahmadi, G., Kian, R. A new comprehensive framework for ranking accepted orders and supplierselection in make-to-order environments (2009) 2009 International Conference on Computers and Industrial Engineering, CIE 2009, art. no. 5223805, pp. 919-924.

Eivazy, H., Rabbani, M., Ebadian, M. A developed production control and scheduling model in the semiconductor manufacturing systems with hybrid make-to-stock/make-to-order products (2009) International Journal of Advanced Manufacturing Technology, 45 (9-10), pp. 968-986.

Eivazy, H., Rabbani, M. An efficient dispatching method in the hybrid make-to-stock/make-to- ordersemiconductor manufacturing systems (2009) 2009 International Conference on Computers and Industrial Engineering, CIE 2009, art. no. 5223916, pp. 1763-1768.

Hemmati, S., Rabbani, M., Ebadian, M. Positioning of order penetrating point in hybrid MTS/MTO environments (2009) EMS 2009 - UKSim 3rd European Modelling Symposium on Computer Modelling and Simulation, art. no. 5358766, pp. 263-268.

Eivazy, H., Rabbani, M. A novel production control model for manufacturing systems with pure MTS,pure MTO, and hybrid MTS-MTO products (2009) 2009 International Conference on Computers and Industrial Engineering, CIE 2009, art. no. 5223907, pp. 652-657.

Rafiei, H., Rabbani, M. Order partitioning in hybrid MTS/MTO contexts using fuzzy ANP (2009) World Academy of Science, Engineering and Technology, 58, pp. 467-471.

Rafiei, H., Rabbani, M. Order penetration point location using fuzzy quadratic programming (2009) World Academy of Science, Engineering and Technology, 58, pp. 453-456.

Rafiei, H., Rabbani, M. Project selection using fuzzy group analytic network process (2009) World Academy of Science, Engineering and Technology, 58, pp. 457-461.

Rafiei, H., Rabbani, M. An MADM framework toward hierarchical production planning in hybrid MTS/MTO environments (2009) World Academy of Science, Engineering and Technology, 58, pp. 462-466.

Rabbani, M., Layegh, J., Mohammad Ebrahim, R. Determination of number of kanbans in a supply chain system via Memetic algorithm (2009) Advances in Engineering Software, 40 (6), pp. 431-437.

Jolai, F., Sheikh, S., Rabbani, M., Karimi, B. A genetic algorithm for solving no-wait flexible flow lines with due window and job rejection (2009) International Journal of Advanced Manufacturing Technology, 42 (5-6), pp. 523-532.

Bajestani, M.A., Rabbani, M., Rahimi-Vahed, A.R., Baharian Khoshkhou, G. A multi-objective scatter search for a dynamic cell formation problem (2009) Computers and Operations Research, 36 (3), pp. 777-794.

Mahdi Mobini, M.D., Rabbani, M., Amalnik, M.S., Razmi, J., Rahimi-Vahed, A.R. Using an enhanced scatter search algorithm for a resource-constrained project scheduling problem (2009) Soft Computing, 13 (6), pp. 597-610.

Ghorbani, S., Rabbani, M. A new multi-objective algorithm for a project selection problem (2009) Advances in Engineering Software, 40 (1), pp. 9-14.

Zaerpour, N., Rabbani, M., Gharehgozli, A.H., Tavakkoli-Moghaddam, R. A comprehensive decision making structure for partitioning of make-to-order, make-to-stock and hybrid products (2009) Soft Computing, 13 (11), pp. 1035-1054.

Ebadian, M., Rabbani, M., Torabi, S.A., Jolai, F. Hierarchical production planning and scheduling in make-to-order environments: Reaching short and reliable delivery dates (2009) International Journal of Production Research, 47 (20), pp. 5761-5789.

Baradaran, S., Fatemi Ghomi, S.M.T., Rabbani, M., Hashemin, S.S. Development of a constructive heuristics rule for constrained resource allocation in stochastic networks (2008) Journal of Applied Sciences, 8 (21), pp. 3917-3923.

Rabbani, M., Panahi, H. An efficient hybrid artificial immune algorithm for clustering (2008) Proceedings - 8th International Conference on Hybrid Intelligent Systems, HIS 2008, art. no. 4626658, pp. 374-379.

Panahi, H., Rabbani, M., Tavakkoli-Moghaddam, R. Solving an open shop scheduling problem by a novel hybrid multi-objective ant colony optimization (2008) Proceedings - 8th International Conference on Hybrid Intelligent Systems, HIS 2008, art. no. 4626649, pp. 320-325.

Gharehgozli, A.H., Rabbani, M., Zaerpour, N., Razmi, J. A comprehensive decision-making structure for acceptance/rejection of incoming orders in make-to-order environments (2008) International Journal of Advanced Manufacturing Technology, 39 (9-10), pp. 1016-1032.

Javadi, B., Rahimi-Vahed, A., Rabbani, M., Dangchi, M. Solving a multi-objective mixed-model assembly line sequencing problem by a fuzzy goal programming approach (2008) International Journal of Advanced Manufacturing Technology, 39 (9-10), pp. 975-982.

Panahi, H., Rabbani, M., Tavakkoli-Moghaddam, R. A comparison of three meta-heuristics for a closed-loop layout problem with unequal-sized facilities (2008) Studies in Computational Intelligence, 134, pp. 265-278.

Tavakkoli-Mogahddam, R., Ghezavati, V.R., Kaboli, A., Rabbani, M. An efficient hybrid method for an expected maximal covering location problem (2008) Studies in Computational Intelligence, 134, pp. 289-298.

Rabbani, M., Rahimi-Vahed, A., Torabi, S.A. Real options approach for a mixed-model assembly line sequencing problem (2008) International Journal of Advanced Manufacturing Technology, 37 (11-12), pp. 1209-1219.

Rabbani, M., Tavakkoli-Moghaddam, R., Parsa, H. A new mathematical model for a distribution network problem in a multi-product supply chain system: A real-case study (2008) International Journal of Manufacturing Technology and Management, 15 (1), pp. 1-11.

Zaerpour, N., Rabbani, M., Gharehgozli, A.H., Tavakkoli-Moghaddam, R. Make-to-order or make-to-stock decision by a novel hybrid approach (2008) Advanced Engineering Informatics, 22 (2), pp. 186-201.

Rahimi-Vahed, A.R., Javadi, B., Rabbani, M., Tavakkoli-Moghaddam, R. A multi-objective scatter search for a bi-criteria no-wait flow shop scheduling problem (2008) Engineering Optimization, 40 (4), pp. 331-346.

Ebadian, M., Rabbani, M., Jolai, F., Torabi, S.A., Tavakkoli-Moghaddam, R. A new decision-making structure for the order entry stage in make-to-order environments (2008) International Journal of Production Economics, 111 (2), pp. 351-367.

Rabbani, M., Manavizadeh, N., Balali, S. A stochastic model for indirect condition monitoring using Proportional Covariate model (2008) International Journal of Engineering, Transactions A: Basics, 21 (1), pp. 45-56.

Tavakkoli-Moghaddam, R., Minaeian, S., Rabbani, M. A new multi-objective model for dynamic cell formation problem with fuzzy parameters (2008) International Journal of Engineering, Transactions A: Basics, 21 (2), pp. 159-172.

Jolai, F., Rabbani, M., Amalnick, S., Dabaghi, A., Dehghan, M., Parast, M.Y. Genetic algorithm for bi-criteria single machine scheduling problem of minimizing maximum earliness and number of tardy jobs (2007) Applied Mathematics and Computation, 194 (2), pp. 552-560.

Jolai, F., Rezaee, M.J., Rabbani, M., Razmi, J., Fattahi, P. Exact algorithm for bi-objective 0-1 knapsack problem (2007) Applied Mathematics and Computation, 194 (2), pp. 544-551.

Tavakkoli-Moghaddam, R., Rabbani, M., Gharehgozli, A.H., Zaerpour, N. A fuzzy aggregate production planning model for make-to-stock environments (2007) IEEM 2007: 2007 IEEE International Conference on Industrial Engineering and Engineering Management, art. no. 4419464, pp. 1609-1613.

Rahimi-Vahed, A.R., Mirghorbani, S.M., Rabbani, M. A hybrid multi-objective particle swarm algorithm for a mixed-model assembly line sequencing problem (2007) Engineering Optimization, 39 (8), pp. 877-898.

Tavakkoli-Moghaddam, R., Safaei, N., Kah, M.M.O., Rabbani, M. A New Capacitated Vehicle Routing Problem with Split Service for Minimizing Fleet Cost by Simulated Annealing (2007) Journal of the Franklin Institute, 344 (5), pp. 406-425.

Rahimi-Vahed, A.R., Mirghorbani, S.M., Rabbani, M. A new particle swarm algorithm for a multi-objective mixed-model assembly line sequencing problem (2007) Soft Computing, 11 (10), pp. 997-1012.

Rabbani, M., Fatemi Ghomi, S.M.T., Jolai, F., Lahiji, N.S. A new heuristic for resource-constrained project scheduling in stochastic networks using critical chain concept (2007) European Journal of Operational Research, 176 (2), pp. 794-808.

Rahimi-Vahed, A.R., Rabbani, M., Tavakkoli-Moghaddam, R., Torabi, S.A., Jolai, F. A multi-objective scatter search for a mixed-model assembly line sequencing problem (2007) Advanced Engineering Informatics, 21 (1), pp. 85-99.

Rezaie, K., Rabbani, M., Taghizadeh, M.R., Ostadi, B. Process capability and process performance (2006) 36th International Conference on Computers and Industrial Engineering, ICC and IE 2006, pp. 5431-5439.

Rezaie, K., Torabi, S.A., Rabbani, M., Ostadi, B. Selecting of suppliers with complex limitations by multi-objective modeling in a supply chain (2006) 36th International Conference on Computers and Industrial Engineering, ICC and IE 2006, pp. 2254-2258.

Jolai, F., Tavakkoli-Moghaddam, R., Rabbani, M., Sadoughian, M.R. An economic production lot size model with deteriorating items, stock-dependent demand, inflation, and partial backlogging (2006) Applied Mathematics and Computation, 181 (1), pp. 380-389.

Rabbani, M., Moghaddam, R.T., Jolai, F., Ghorbani, H.R. A comprehensive model for R and D project portfolio selection with zero-one linear goal-programming (2006) International Journal of Engineering, Transactions A: Basics, 19 (1), pp. 55-66.

Tavakkoli-Moghaddam, R., Rabbani, M., Ghodratnama, A., Ahmed, P.K. Allocation of parts to cells, minimising tardiness and idle time by simulated annealing (2005) International Journal of Manufacturing Technology and Management, 7 (5-6), pp. 581-593.

Tavakkoli-Moghaddam, R., Rabbani, M., Saremi, A., Safaei, N. Solving the backhaul vehicle routing problem by genetic algorithms (2005) Proceedings of the 35th International Conference on Computers and Industrial Engineering, ICC and IE 2005, pp. 1905-1910.

Tavakkoli-Moghaddam, R., Rabbani, M., Hakami, M., Kazemi, M. Heuristic algorithms to solve a bi-criteria traveling salesman problem with fuzzy time window (2005) Proceedings of the 35th International Conference on Computers and Industrial Engineering, ICC and IE 2005, pp. 1899-1904.

Rabbani, M., Miraliyari, S.A. Bi-objective optimization of JIT production systems in batch manufacturing environment: Minimum WIP cost and resource overtime cost (2005) Amirkabir (Journal of Science and Technology), 16 (62 B), pp. 17-28.

Tavakkoli-Moghaddam, R., Rabbani, M., Iman-Eini, M. Solving manufacturing cell formation problems in dynamic and stochastic states by a hybrid method [Solving manufacturing cell formation problems in dynamic and stochastic states by a hybrid method] (2004) Amirkabir (Journal of Science and Technology), 15 (58 D), pp. 435-451.

Rabbani, M., Moghaddam, R.T., Ranjbar, M. An efficient algorithm for solving bi-objective fuzzy job-shop scheduling problems by genetic algorithms and data mining [An efficient algorithm for solving bi-objective fuzzy job-shop scheduling problems by genetic algorithms and data mining] (2004) Amirkabir (Journal of Science and Technology), 15 (58 D), pp. 570-591.

Tavakkoli-Moghadam, R., Rabbani, M., Godratnama, A., Safaei, N. An efficient algorithm to allocate parts to cells maximizing cell efficiency (2004) International Journal of Engineering, Transactions B: Applications, 17 (4), pp. 381-388.

Fatemi Ghomi, S.M.T., Rabbani, M. A new structural mechanism for reducibility of stochastic PERT networks (2003) European Journal of Operational Research, 145 (2), pp. 394-402.