Editor


M.M. Mazdeh, Iran University of Science and Technology
Iran
Email: mazdeh@iust.ac.ir
Publications




Ghamari, R., Mahdavi-Mazdeh, M., & Ghannadpour, S. F. (2022). Resilient and sustainable supplier selection via a new framework: a case study from the steel industry. Environment, Development and Sustainability, 24(8), 10403-10441.

Bank, M., Mazdeh, M. M., Heydari, M., & Teimoury, E. (2021). Coordinating lot sizing and integrated production and distribution scheduling with batch delivery and holding cost. Kybernetes.

Namakshenas, M., Braaksma, A., & Mahdavi Mazdeh, M. (2022). Minimising total earliness and tardiness with periodically supplied non-renewable resource profiles. International journal of production research, 60(10), 3170-3181.

Kazemi, H., Mahdavi Mazdeh, M., Rostami, M., & Heydari, M. (2021). The integrated production-distribution scheduling in parallel machine environment by using improved genetic algorithms. Journal of Industrial and Production Engineering, 38(3), 157-170.

Mahjoub, N., Sahebi, H., Mazdeh, M., & Teymouri, A. (2020). Optimal design of the second and third generation biofuel supply network by a multi-objective model. Journal of Cleaner Production, 256, 120355.

Jassbi, A., Jafari, M., Mazdeh, M. M., & Maleki, M. (2021). Structural Model of Foresightful Export-Oriented Strategies for Iran Pharmaceutical Industry Using the Fuzzy DEMATEL Method. Iranian Red Crescent Medical Journal, 23(11).

Zolfaghari, S., Aliahmadi, A., Mazdeh, M. M., & Zare, J. (2020). The alignment between business strategy and project strategy and its effects on the dimensions of project success using PLS-SEM. International Journal of Business Excellence, 21(2), 250-273.

Bank, M., Mazdeh, M., & Heydari, M. (2020). Applying meta-heuristic algorithms for an integrated production-distribution problem in a two level supply chain. Uncertain Supply Chain Management, 8(1), 77-92.

Soudi, A., Heydari, M., & Mazdeh, M. M. (2019). A new approach for integrated surgical procedure scheduling with arrival uncertainty. International Journal of Operational Research, 34(3), 430-449.

Noroozi, A., Mazdeh, M., Heydari, M., & Rasti-Barzoki, M. (2019). Coordinating order acceptance and integrated lot streaming-batch delivery scheduling considering third party logistics. Uncertain Supply Chain Management, 7(1), 73-96.

Basir, S. A., Mazdeh, M. M., & Namakshenas, M. (2018). Bi-level genetic algorithms for a two-stage assembly flow-shop scheduling problem with batch delivery system. Computers & Industrial Engineering, 126, 217-231.

Hamidinia, A., Khakabimamaghani, S., Mazdeh, M. M., & Jafari, M. (2012). A genetic algorithm for minimizing total tardiness/earliness of weighted jobs in a batched delivery system. Computers and Industrial Engineering, 62(1), 29-38.

Mahdavi Mazdeh, M., Rostami, M., & Namaki, M. H. (2013). Minimizing maximum tardiness and delivery costs in a batched delivery system. Computers and Industrial Engineering, 66(4), 675-682.

Mahdavi Mazdeh, M., Sarhadi, M., & Hindi, K. S. (2008). A branch-and-bound algorithm for single-machine scheduling with batch delivery and job release times. Computers and Operations Research, 35(4), 1099-1111.

Mazdeh, M. M., Esfahani, A. N., Sakkaki, S. E., & Pilerood, A. E. (2012). Single-machine batch scheduling minimizing weighted flow times and delivery costs with job release times. International Journal of Industrial Engineering Computations, 3(3), 347-364.

Mazdeh, M. M., Hamidinia, A., & Karamouzian, A. (2011). A mathematical model for weighted tardy jobs scheduling problem with a batched delivery system. International Journal of Industrial Engineering Computations, 2(3), 491-498.

Mazdeh, M. M., Sarhadi, M., & Hindi, K. S. (2007). A branch-and-bound algorithm for single-machine scheduling with batch delivery minimizing flow times and delivery costs. European Journal of Operational Research, 183(1), 74-86.

Mazdeh, M. M., Shashaani, S., Ashouri, A., & Hindi, K. S. (2011). Single-machine batch scheduling minimizing weighted flow times and delivery costs. Applied Mathematical Modelling, 35(1), 563-570.

Mazdeh, M. M., Zaerpour, F., & Jahantigh, F. F. (2010). A fuzzy modeling for single machine scheduling problem with deteriorating jobs. International Journal of Industrial Engineering Computations, 1(2), 147-156.

Mazdeh, M. M., Zaerpour, F., Zareei, A., & Hajinezhad, A. (2010). Parallel machines scheduling to minimize job tardiness and machine deteriorating cost with deteriorating jobs. Applied Mathematical Modelling, 34(6), 1498-1510.

Rasti-Barzoki, M., Hejazi, S. R., & Mazdeh, M. M. (2013). A branch and bound algorithm to minimize the total weighed number of tardy jobs and delivery costs. Applied Mathematical Modelling, 37(7), 4924-4937.

Jafari, M., Rezaeenour, J., Mazdeh, M. M., & Hooshmandi, A. (2011). Development and evaluation of a knowledge risk management model for project-based organizations: A multi-stage study. Management Decision, 49(3), 309-329.

Shafia, M. A., Mazdeh, M. M., Vahedi, M., & Pournader, M. (2011). Applying fuzzy balanced scorecard for evaluating the CRM performance. Industrial Management and Data Systems, 111(7), 1105-1135.